The Equity The Equity Scope of work: Plumb a 2-bay load out building Included: Installation of (13) HDPE underground lines 4”, 6”, & 8” Installation of (2) 12’ diameter water tanks Installation of (2) 3” truck load in lines Installation of (2) 4” SS manifolds inside building Installation of (2) top and bottom load outs Fabricated and installed a 6’ x 18’ platform w/stairs Installed (2) 7-step safety stairs w/hoop Fabricated (3) SS sumps w/grates for the building Installation on 2” SS piping for (20) SS chemical tanks Fabrication and installation of 152’ of pipe chase Fabrication and installation of 120” of catwalk + (1) stairway Installation of (30) Hot load ports Installation of SS piping to a weigh unit Piping in outside dike for (3) tanks Installed (2) 3,000-gallon poly tanks (1 for corn/1 for beans)