The Equity

The Equity

Scope of work: Plumb a 2-bay load out building

Included:

  • Installation of (13) HDPE underground lines 4”, 6”, & 8”
  • Installation of (2) 12’ diameter water tanks
  • Installation of (2) 3” truck load in lines
  • Installation of (2) 4” SS manifolds inside building
  • Installation of (2) top and bottom load outs
  • Fabricated and installed a 6’ x 18’ platform w/stairs
  • Installed (2) 7-step safety stairs w/hoop
  • Fabricated (3) SS sumps w/grates for the building
  • Installation on 2” SS piping for (20) SS chemical tanks
  • Fabrication and installation of 152’ of pipe chase
  • Fabrication and installation of 120” of catwalk + (1) stairway
  • Installation of (30) Hot load ports
  • Installation of SS piping to a weigh unit
  • Piping in outside dike for (3) tanks
  • Installed (2) 3,000-gallon poly tanks (1 for corn/1 for beans)